Zuwara Port – Maintenance & Development |
|
|
|
Location:
|
Zuwara, Libya
|
Client:
|
Libyan Port and Maritime Transport Authority
|
Year:
|
2007 – 2009
|
Description:
|
Royal Haskoning and Maward Consulting Engineers performed a site investigation and design study on the maintenance and development of the existing port of Zuwara. The present port consists of a rubble mound breakwater constructed in 1937 and a jetty built some 40 years ago. The new design includes the rehabilitation of the breakwater, a new 450 m long quay wall with an on dock container yard, port buildings, dredging/reclamation and navigational aids. Based on the developed design dedicated D&C tenders documents were produced.
|
|